Quantcast
Channel: SCN: Message List
Viewing all articles
Browse latest Browse all 3316

Re: I am in the middle of the replication , JEST table is using one single . How to change it to parallel processing.

$
0
0

Hi Tobias

 

Thanks for the information. My requirement is to replicate total 552 tables. out of 552, 30 tables are huge.

So i will set "resource optimize" and upload 522 table(small tables)  USING csv file. AFter completion of initial load of this set, I will set "performance optimize" and upload 30 tables CSV file.

 

Let me tell you about my understanding on the big tables... Once i set "performance optimize" for 30 tables, will it use "parallel processing" automatically ? or do i have to set manually in LTRS for 30 tabels?

 

Basically i want to utilize all the processes and finish the load fast.

 

Now what i used is, unloaded all 552 tables using CSV file and it took so many days. some tables used single DIA processes, some tables used multiple processes. some used DB , did not show up in SAP SM50.

 

 

 

 

 

I have one more problem facing now, some time back , i have suspended  some tables then it was showing as "load/replication blocked" in the LTRC.

then i resumed the tables, In HANA, it was showing "Resume", "scheduled".

In LTRC, its stil showing "load/replication blocked" .

i dont know how to bring the tables back to replciation mode? i tried using resume from LTRC and HANA . it did not work.

 

Do i need to remove the "L" from the below screen for each and every table ?

Capture.JPG

 

 

 


Krishnarjun


Viewing all articles
Browse latest Browse all 3316

Trending Articles



<script src="https://jsc.adskeeper.com/r/s/rssing.com.1596347.js" async> </script>